
FAB003
Cow Shed
Cow Shed was 10-month long development completed in 2019.
Details
- Location
- To be confirmed
- Size
- To be confirmed
- Value
- £500k
- Contract type
- Design and Build Contract
- Contract period
- 10 months
- Complete
- 2019
- Construction
- Fabric in collaboration with Form
- Architecture & interior design
- Tyler Parkes and Fabric
Back to projects
FAB003Cow Shed